The treehouse is down. Went up on the ladder with the sawzall a couple of weekends ago and made pretty short work of it, considering that it was fairly sturdily built — except of course it was built of non-treated lumber so the roof was bowed in and the 2x4s were soaking wet. It’s really amazing how big the pile of junk lumber is from such a small building.

No more treehouse!

The absurdly large debris pile

The bathroom shelves are up, or at least two of them are since for some reason the middle shelf didn’t fit. I’m not terribly happy with how they came out, but at least there are shelves there and we can start using them for storage. When I have a few bucks lying around I’ll go get a sheet of birch plywood and do them better. I figure if I construct the shelf and the braces in one unit and attach it to the wall all together there will be fewer gaps.

The bathroom touchup painting isn’t done, but all the holes are filled and sanded. I now know that putty has to be applied pretty thickly because it shrinks as it cures. Hopefully I can finish that next weekend, and paint the door and window jambs where the old pink paint is showing through.

Last, I demoed out the wall in front of the old basement access door, and removed the plywood covering the stairs that gave us so much trouble with the underwriters last fall. Apparently, Nate is a big do-do head crap’r, whatever that means. Once I get the door freed of its very thick layer of silicone/rubber/whatever-the-hell-it-is caulk and get a padlock installed, I can move forward with taking out the existing stairs and filling in the living room floor with a temporary plywood patch.

Oh, those wacky previous owners!

I also have a good quote from an electrician to upgrade the service to 200 amps. Now I need to figure out what the schedule is for inspections and for Seattle City Light to hook up the new mast, and then I can schedule the electrician. I’m moving the location of the panel to the foundation wall, so I can remove the plastered-over stud wall the current panel is attached to when I completely gut the basement.