I haven’t been posting the last few days because I’ve either been too goddam busy or too goddam tired.
The difference between the DIY reality shows and reality is that the shows never show people covered in filth on top of a ladder working with heavy tools at arm’s length in the middle of the night.
Monday I pulled down the ceiling and dropped a huge pile of rockwool all over everything — I pulled one nail off the corner of each sheet of drywall and the whole thing came down. There were a bunch of nails in the joists, but the drywall must have been completely rotten. After I cleaned all of that up, I scraped up all the vinyl flooring and the linoleum underneath it (at least I hope it was linoleum). Also, the building inspector showed up for the preliminary inspection, and signed off on all our plans, including the stairs; what was especially useful is that he let me know that on old existing buildings they’re understanding about what’s possible and what isn’t, and with respect to the winding stairs that the 6″ inner width of the tread was the most important part and that if we missed the 10″ middle width by a quarter-inch or so they could let it slide.