Posts Tagged drywall

Casings!

… and sills and jambs and doors and floor patches (oh my).

Lots of progress since the last post.

Two weeks ago I got the prehung door in, which was a bitch and a half to do solo. I plumbed it up and the door wouldn’t close. It’s a solid MDF core semi-custom Jeldwen door, so it’s pretty heavy. I had to do lots of adjusting and re-shimming to get the door to swing shut, and I didn’t realize until just yesterday when I was putting the casings on that it was actually seriously out of plumb, because the door was sagging in the frame on the top hinge. Once I did the thing with the long screw into the framing, it squared right up and I was able to re-adjust the frame so it was plumb. A little loosening of the screw adjusted the door so the latch would go into the strike plate. It’s a little tough to close, but completely within acceptable limits.

The closet door jamb was easy by comparison, and hanging the bifold doors was a snap. Unfortunately, they’re basic unfinished slab doors which suck down the paint, so I’m going to have to give it a third coat (at least) so as not to see dark wood grain through the white.

I also built the window jambs and sills. This proved to be difficult. I’m using MDF, so it doesn’t plane very well, so I had to resaw the boards to narrower and narrower widths on the table saw to get them to fit property. And for some reason I couldn’t get them tight to the window, so there’s about a 3/32″ gap that I’ll need to fill in with caulk.

Last weekend I built all the lintels. I knew I wanted to do a keystone design, but the problem was how to get a three-piece lintel to have nice tight joints and all be on the same level plane. I’ve been planning on getting a pocket hole kit for eventually doing built-ins and cabinets, so I went ahead and ordered this one and used it to mate up the lintel pieces with the keystone. I made a jig to make it a repeatable process, which I’ll keep around to make more in the future.

Yesterday I got the nailgun back out and put up all the door and window casings in the bedroom (I still have to do the simple casing on the inside of the closet).

The door and window casings in the hall will have to wait until I can saw or plane off a quarter inch of the existing jambs. They were built to be even with the old 3/4″ tongue-and-groove planks, so now that there’s 1/2″ drywall there’s too much jamb. Planing seems like it would take forever, but I’m not sure how to get a controlled saw cut. Maybe I need to buy a jigsaw.

Next week I clean up enough sawdust around the edges to put on the baseboards. I’ll be using 1/2″ x 5 1/2″ MDF boards, but I’m thinking that a square edge on top will be boring and tend to collect lots of dust, so I think I’m going to cut the top at a 45° angle. Yay tablesaw!

Also, back when the room was still open framing, one of our cats liked to use the closet corner as a scratching post. Unfortunately, the mere existence of drywall and paint on that corner didn’t discourage him, and he scratched a hole in the paint. I sanded it, patched with patching compound (I also patched the socket cuts where the hole was too big for the plate), and primed. When I do touchup painting, I’ll paint them, and then screw 4″ of plexiglas on each side up from the baseboard to higher than he can reach. Damn cat.

Jen’s had some luck in using mineral spirits and Murphy’s Oil Soap to get the mastic off the floor, starting in the hall. But nothing else we’ve tried so far has worked as well as the time I unknowingly spilled a bottle of air compressor oil on my way out of the room and left it there overnight. So maybe we’ll just get a big bottle of light oil, mop it onto the floor and clean it off the next day. Seems plausible. Right?

 

Next on the agenda

  • Apply border
  • Wall plates for the plugs
  • Install door jamb and bifold doors for the closet
  • Install prehung bedroom door
  • Install window jambs and sills
  • Install casings (mostly)
  • Patch floor where old wall floor plates used to be
  • Fill and paint nail holes
  • Touch up painting
  • Install plexiglas corner protector
  • Clean old linoleum mastic off the floor
  • Move my daughter and all her stuff in

P.S. Our friend Erin came over and painted clouds on the blue-sky ceiling. And they look gorgeous.

Tags: , , , , ,

Second Bedroom Gets Closer to Done

Five weeks ago it looked like this:

    

Four weeks ago it looked like this:

    

The white stripe is where the boundary masking tape went. It’ll be covered up by a self-stick flowers-and-garlands border we got from Amazon.

Two weeks ago it looked like this:

Look! Lights and plugs!

The upstairs storage area is lighted as well.

Next on the agenda

  • Apply border
  • Wall plates for the plugs
  • Install door jamb and bifold doors for the closet
  • Install prehung bedroom door
  • Install window jambs and sills
  • Install casings
  • Patch floor where old wall floor plates used to be
  • Clean old linoleum mastic off the floor
  • Move my daughter and all her stuff in

Lessons Learned

If you have a 10′ wall, don’t try to cut down a single piece of 12′ drywall. There’s no way to get a tight fit and maneuver it into place, and plus you’ll crunch all the corners. Instead, just accept that you’ll have butt joints to mud and feather with the tradeoff that you won’t have big gaps at the edges to fill.

Tags: , ,

Still Here

Right. The earth did not open up and swallow us whole along with our house.

The back bedroom project is still underway, though. After gutting it back in March and April, we pretty much ran out of time and money. In May I was able to get all the framing done: I filled in the existing exterior door, framed two windows, added a real closet, and created a rough door opening where the end of the hallway once was. In June or thereabouts I was able to buy a roll of wire and run the almost all the electrical. And there I stopped for a couple of months.

Luckily, Jen had some stock options from her job that became sellable in August, so we finally had the money to get all the remaining stuff. Last week I took advantage of some time off work and finished the rough electrical and had it inspected (passed except for one minor issue with the closet light fixture placement). I also installed the folding attic stairs (I was able to do it entirely myself with the assistance of our drywall lift — thanks Jen!)

This morning, I went to Home Depot and ordered all the plywood, drywall, joint compound, doors, tar paper, light fixtures, switches, receptacles, etc. that I’ll need to complete (almost) everything. It gets delivered on Tuesday, so I get to spend this weekend doing everything that I can get done short of having the materials on hand: clean up the room, fill in all the floor/ceiling holes with firestop foam, pull the vinyl siding off the relevant sections of wall, flash the rough window openings, etc.

No pictures for this post, but I’ll take plenty as I work on everything next week.

Tags: , , , , , ,

Some Progress Lately

The treehouse is down. Went up on the ladder with the sawzall a couple of weekends ago and made pretty short work of it, considering that it was fairly sturdily built — except of course it was built of non-treated lumber so the roof was bowed in and the 2x4s were soaking wet. It’s really amazing how big the pile of junk lumber is from such a small building.

No more treehouse!

The absurdly large debris pile

The bathroom shelves are up, or at least two of them are since for some reason the middle shelf didn’t fit. I’m not terribly happy with how they came out, but at least there are shelves there and we can start using them for storage. When I have a few bucks lying around I’ll go get a sheet of birch plywood and do them better. I figure if I construct the shelf and the braces in one unit and attach it to the wall all together there will be fewer gaps.

The bathroom touchup painting isn’t done, but all the holes are filled and sanded. I now know that putty has to be applied pretty thickly because it shrinks as it cures. Hopefully I can finish that next weekend, and paint the door and window jambs where the old pink paint is showing through.

Last, I demoed out the wall in front of the old basement access door, and removed the plywood covering the stairs that gave us so much trouble with the underwriters last fall. Apparently, Nate is a big do-do head crap’r, whatever that means. Once I get the door freed of its very thick layer of silicone/rubber/whatever-the-hell-it-is caulk and get a padlock installed, I can move forward with taking out the existing stairs and filling in the living room floor with a temporary plywood patch.

Oh, those wacky previous owners!

I also have a good quote from an electrician to upgrade the service to 200 amps. Now I need to figure out what the schedule is for inspections and for Seattle City Light to hook up the new mast, and then I can schedule the electrician. I’m moving the location of the panel to the foundation wall, so I can remove the plastered-over stud wall the current panel is attached to when I completely gut the basement.

Tags: , , , , , , ,

OMG I’m So Done With This Damn Bathroom

I am so sick of working on this bathroom. Rather, I’m so sick of working on this bathroom and having one stupid thing after another break or go wrong, or just be poorly designed (or have the instructions not match the equipment).

But before I start ranting, here’s the progress so far (and there really has been a lot of progress, just a whole hell of a lot slower than I wanted):

Tile

The tile is done. Well, all but done. It’s all on the walls and floor, and it’s all grouted. The wall tile is Rittenhouse Square 3×6 in white with black accent tiles, and the floor tile is Octagon & Dot, both from Dal-Tile. Grout is Polyblend Delorean Gray, sanded on the floor and unsanded on the walls.

The wall grout was difficult and it’s not as clean as I’d hoped, because I only had just enough grout so I was trying to conserve it, and then I ran out of time toward the end and tried to basically do the entire shower at once, which meant that it had started setting up by the time I got around to sponging the excess off. And wiping, wiping, wiping on a vertical surface was very hard on my arms and back.

The floor grout was a lot easier. Granted, there was only about a third as much floor square footage as wall square footage, but the joints being bigger and the whole thing being horizontal made it a lot easier. I only used about a third of the 25 pound bag, but since I didn’t know better I mixed up the whole thing — which is now completely set up in the bucket; I used a plastic bucket that cat litter came in because I intended it to be disposable.

IMG_0763

We haz tile

Paint

Jen presciently bought us a Wagner Paint Crew airless sprayer and a roller arm accessory. It took me a while to figure out how to set it up, and the first coat of primer went on pretty slowly. After that, however, the second coat of primer and two coats of paint only took half an hour each. We used Sherwin-Williams Bath Paint, and I have about a quarter gallon left to use on the window and door trim. Sherwin-Williams says the stuff is self-priming, but I don’t believe them. It took two coats to really cover and get out all the thin spots. On the other hand, it went on really well, and I think it was a good value despite being $40 a gallon. The only downside is that it’s so white (I didn’t have them tint it at all) it makes the white tile look off-white. 🙂

IMG_0762

We haz paint

Shower Valve

And now we come to the clusterf*** portion of the program.

We got the Premier Torino shower/valve/faucet set (and the matching sink faucet). It’s pretty, but in retrospect I wish I’d looked at a model in person instead of just ordering it off the internet — turning the handle adjusts both temperature and pressure simultaneously, so there’s no way to have a lukewarm trickle; a quarter turn from off is both half and half hot and cold and maximum flow. I’d have preferred the type where turning it adjusts the temperature and pulling it adjusts the pressure.

Anyway, there’s a brass bolt with a threaded hole through the center sticking out from the valve that the handle attaches to. Apparently in order to adjust for different valves, wall thicknesses, etc., it’s overly long and you’re supposed to cut it back to the proper length.

Here’s the problem: there’s a brass adapter that screws into the bolt with a knurled knob on the end; the handle fits onto that with a locking screw to hold it on. So I measured and marked where to cut the bolt to have the adapter sticking out far enough to have the handle sit flush with the escutcheon. No problem. But then I cut it, screwed the escutcheon on over it, and then discovered that there’s a piece molded into the top of the escutcheon that blocks the adapter from going in far enough.

So in other words, it’s impossible to have the handle flush with the top of the escutcheon. Now, the instructions are less than clear: the parts list shows the adapter and locking screw, but the assembly instructions show a screw going through the handle and into the bolt with no adapter. I wonder if I have the adapter, handle and locking screw from the newer model but the escutcheon from the older model.

Right now I have it entirely assembled sans escutcheon, so it works but looks kinda ugly. And I get to have the I’m sure wonderfully pleasant experience of calling their customer service and attempting to explain all this over the phone and ordering at least one new part. Grrr.

Oh, and I almost forgot: I was screwing the shower head arm back into the drop-ear elbow inside the wall. The “tight” spot had the arm at a 45° angle past vertical, so I could back it off 45° or push on almost another whole turn. I looked at the threads and it wasn’t really threaded very far, so I went ahead and cranked it. I got about halfway when the goddam drop-ear broke inside the wall. Or at least something broke; I’m hoping it was just the screws and not the brass fitting. Regardless, I’m going to have to cut open the wall, fix or replace it, and patch and paint. Grr raar raar raar.

Fixtures

The shower curtain rod went up easily, since I’ve already put it up temporarily and taken it down again, um, five times now I think. It’s a double curved curtain rod from Bed Bath & Beyond — I like having the curved rod since I really dislike brushing up against a damp plasticky curtain liner while showering.

IMG_0761

We haz a shower curtain rod

The medicine cabinet was easy, as were the sconce lights. The overhead light was more difficult, since somewhere along the line it didn’t quite get set proud of the joists by quite enough, so the bolts hanging down from the box to screw the base onto weren’t long enough. A trip to the hardware store later (the next day) it went up just fine. Note to self, however: leave a longer wire to attach to. Last, there was again something wrong with the fan blocking and it wants to droop down a quarter inch or so from the ceiling, which means I have to climb up into the attic and figure out how to attach it better. Bah.

IMG_0764

Medicine cabinet & sconces are in

IMG_0765

Light and fan are in

Another annoying issue — chalk yet another thing up to inexperience — is the wall sockets. Those little spacer nubs on plastic electrical boxes that are supposed to leave the top of the box flush with the installed drywall? They lie. All my boxes are recessed about 3/16″. Not fatal — I can unscrew them and put in longer screws and spacing washers. But the other thing I didn’t know is that you have to cut the hole in the drywall exactly the size of the box, or at least no more than 1/8″ larger. The snap-on Decora plates need to brace against the drywall, and I’ve got too much of a gap. I’ll need to get out the patching compound that dries hard as rock and fill in around the boxes, and then paint the compound, and only then attach the switch/socket plates. Dammit.

Toilet

We got the American Standard Champion 4 from Home Depot. Installation was pretty easy, except for the feed valve, which just did not want to go onto the copper stubout. Eventually I’d damaged the brass compression fitting enough that I just threw that valve away and went with another one. A whole lot of vice grip + pliers action later, it was watertight. That was yesterday at 1:00am.

IMG_0768

Toilet installed

IMG_0767

Look! It flushes!

IMG_0772

My sophisticated leak detection device

Sink

Clusterf*** part II. We got a pedestal sink off Craigslist from a guy up in Marysville with two warehouses full of … stuff. It’s fairly nice looking and we paid way less than retail because it apparently got dropped in the box and the top of the pedestal was broken. I was able to superglue it all back together and reinforce it with fiberglass tape and adhesive, so I didn’t think there would be any problem.

Until I got both pieces out of the box and put together in good light. At which point I realized that not only were they not quite the same color (white/off-white), but the top of the pedestal doesn’t actually fit into the groove at the bottom of the sink — they’re different models.

Okay. Fine. The pedestal isn’t really important in that it as long as it’s supporting its share of the weight it doesn’t need to be perfectly mated to the sink, and sometime next year when we have more money we’ll just get a new damn sink. So I put them up against the wall and spent an hour getting the assembly perfectly positioned and leveled and the screw holes marked.

My brand new carbide bit that I used to drill the holes for the toilet flange yesterday no longer wanted to drill through tile at all, so I made a late night run to Home Depot and found a set of tile and glass drill bits that I swear they didn’t have when I was looking for them weeks ago. I certainly wish I’d had them before, since they cut through the tile like buttah.

Hooray, right? Well, I put my wood bit into my drill to complete the pilot holes for the wall mounting screws and when it punched right through into air discovered that I’d made a fundamental error. I’d never seen a pedestal sink unattached to a wall before, so months ago I looked at the big holes in the middle of the back and thought that’s where you put in lag bolts with big washers or whatever. I was wrong, as I discovered when I watched a pedestal sink installation video online.

Here, I’ll let the pictures tell the story:

sink_1

sink_2

So since at this point I can’t go in through the back of the wall and put in more blocking, I’m going to have to cobble up some lag bolt solution after all — tomorrow.

Punch List

  1. Get some more grout and fill in all the little gaps, in corners and just where I missed a bit.
  2. Call the shower valve company and get some new parts
  3. Scrape and clean all the excess grout, paint, and joint compound off the tile
  4. Silicone all the tile/drywall joints and around the tub
  5. Put up the @#$%*&! sink
  6. Fill in around the switch and socket boxes
  7. Clean, paint, and reinstall the door and window casings
  8. Fix the fan blocking
  9. Insulate the ceiling

Jen keeps telling me what a good job of everything I’m doing, but I’ve been so frustrated by stupid shit going wrong that all I can see is the imperfections. This project started out as hard work but fun and interesting. It’s not fun anymore. I have two days to finish the last couple of crucial items before we have people over for Thanksgiving, and then presumably complete the rest over the long weekend.

Then I want to not think about projects for a while. The rest of this house had better not be this stressful.

Tags: , , ,

Lots Of Progress, or, My Wife Is Awesome

The Baby Gate

Since we have a little one who will be bipedal any day now yeesh, Jen’s been after me to put up a baby gate at the top of the stairs. The instructions said it needs to be installed into a solid if not structural elements, which presented a problem. The staircase has sidewalls, but they have about three 2×4 studs each — you can wiggle them about an inch either way without even needing any effort — so I couldn’t install the gate into the obvious opening. There are structural columns at the top of the stairs which are in place of the original outer wall of the gable cottage but which now form one of two arches from the addition on either side of the fireplace — one into the stairwell and the other into the living room. But they’re too far apart for the gate.

So I built extensions, I guess you could call them, that anchor into the columns and make the opening narrow enough for the gate to fit. They’re not particularly pretty (I learn a lesson about carpentry every time I pick up a power tool: in this case, don’t try to drill a perfectly perpendicular hole without one of those mini-drill presses you attach to your drill), but at least instead of having bare ends of 4×4 posts sticking up I covered them with little fence post caps.

IMG_0301

And, since they don’t meet the stair sidewalls or the fireplace, the cats can get around them but even a bipedal baby can’t:

IMG_0302

So it’s nice to have one project completely done with and checked off the list.

The Bathroom

I got the floor down a couple of weeks ago, but it’s just been sitting there mocking me ever since.

As you can see in the photos, it’s an octagon-and-dot mosaic tile, and I really should have used a smaller-notch trowel. Pretty much every joint has thinset squidged up into it. That is to say, every one of the thousands and thousands of little tiny joints has thinset squidged up into it, some halfway, some to the top. Scraping them out with a utility knife is going to take forever.

I’ve been working slowly on finishing the drywall — it’s not that it’s particularly difficult, it’s just the first time I’ve done it so I’m figuring out my technique as I go along. But the bathroom absolutely must without fail be all the way done by Thanksgiving, so I took the day off work today to get as much done as possible. I spent the morning doing second-coat on the drywall, and then Jen called and said she was taking a half day and would be home to help.

So we decided to attack the walls. I mixed up a bunch of thinset, set up the borrowed laser level along the reference lines I’d already marked, and then Jen went to town setting all the field tile while I worked on making all the odd cuts and fits. The result: we have walls!

IMG_0305IMG_0306IMG_0307

There are two reasons we didn’t completely finish: I can’t do the ends of the shower walls because the end-bullnose tiles are on order, and I can’t do the top row of tiles until I’ve skim-coated the drywall (since there will be a bit of overlap). The bottom row of black tiles is just going to be an evening of cutting and fitting, and we were both tired after working all day, so that’ll have to be another post for another day.

And here’s why my wife is awesome: not only did she do almost all of the work to get the tile up, she actually got it up a lot faster than I would have done. If she hadn’t taken a half day off, I’d probably have gotten one wall done and maybe two, instead of all of them. And that doesn’t even mention all the work on the rest of the house she’s been doing while I’ve been putting all my energy into one room. The fact that this place looks like a home instead of a box and tool storage facility is all due to her.

Update:

So you’ll remember the missing drain hole for the sink. I’m happy to say that it was pretty easy going in through the linen closet, since it was faced in particle board, not the 3/4″ tongue-and-groove of the bedroom closet, and my measurements were pretty darn close:

IMG_0300

(Yes, I’m aware that it’s not centered. The sink, shelf, and medicine cabinet aren’t centered on the old pre-existing drain line, mostly because of having to mount both sconce lights into studs and find a center point between them.)

Now I have to figure out the best way to interface between the 1-1/2″ ABS and the 1-1/4″ standard sink drain and P-trap. I guess the trap escutcheon is going to have to cover a lot.

Oh, and here’s a photo I forgot to put up months ago.

IMG_0699

Moral: don’t try to pull eighty-year-old framing nails out of eighty-year-old wood with a little bitty finishing hammer.

Tags: , , , , ,

Score!

Jen saw this at Amazon this morning and it is ours for the low low price of $99.95!

Even with $80 shipping, it’s still cheaper than Craigslist. No more manual lifting! Woot!

Tags: ,

Been A Long Time

… Since the last post. And the bathroom’s still not done, dammitall.

I kinda ran out of PTO (well, not really, but I ran out of time I could stay away from work without making my boss mad), and then we moved in. You’d think that moving in would mean I’d be able to get more work done, but actually living here means I’m not alone when I’m here and thus liable to being called away to look after the baby, lift heavy things for Jen, install shelves in closets, fix the internet connection, and all the other obligations of daily married-with-children home life. Plus it’s very difficult to work in the evenings as either we’re eating dinner, I’m giving Jen a break from the baby, or they’ve gone to bed and the noise would wake either or both.

We moved in on September 25 pretty much without a hitch. We used Mountain Movers, who I have to recommend, as they were tireless, efficient, and professional. I managed to severely roll my ankle going down our porch stairs, and it still hurts two weeks later. If I hadn’t been wearing my combat boots I’d probably have sprained it.

Jen’s been getting lots of unpacking and organizing done. The house looks almost entirely like a home and not a storage facility, although we don’t have the books out yet — mostly because the parlor, where the bookshelves will go, is being used for temporary drywall storage.

Speaking of drywall, our friend Chris has been coming over on weekends to help out. Together we got all the necessary blocking (for nailing/screwing edges) installed, the outside wall insulated, the ceiling drywall hung (not that well, sadly), and about half the wall drywall and cement board hung.

Yeah. So, I’m never drywalling a ceiling again without a drywall lift. That shit is heavy. And next time, I’m cutting the drywall from the back side, because I guess thirty years of playing D&D and other tabletop RPGs has left me able to precisely conceive and measure a top-down plan but nearly incapable of measuring, drawing and executing a bottom-up view. Suffice to say that one piece of the ceiling went up fairly well with a minimum of fitting, but the second, more complicated piece ended up with either half-inch-plus gaps or overly-tight, creaking, breaking spots around the edges. There’ll be a lot of filling with joint compound in my future when I get to the taping stage.

Also, when I say we got about half the drywall and cement board up, I kinda mean the middle half, vertically. The plan is for 42″ tile wainscoting with drywall above. The walls are 95″-96″ high. Cement boards are 36″ wide, leaving a ~6″ gap at the bottom to be filled with a strip of cement board. Drywall is 48″ wide, leaving a ~4″-5″ gap at the top. I still have to fill in those gaps. (Oh, and I discovered that there’s a 1/2″ difference in the floor from one corner of the bathroom to the other. Luckily, the two walls on which I’ll have to cut base tiles at an angle will be mostly concealed by the toilet, sink, and dresser, so I hope it won’t be all that obvious.)

I’m pretty sure I can get the rest of the drywall and cement board up this weekend (Chris is busy). The only pieces larger than 36″x60″ are the closet drywall walls, which are standing on end and thus will be easy to maneuver and install. I need to install the floor cement boards, but for some reason I’m very nervous about mixing the thinset, even though it looks dead easy on TV. This is probably the same nervousness that makes me a lousy cook — when they say “mix until it’s the consistency of peanut butter” I get all anxious; do they mean creamy Jif, or do they mean that oily runny organic stuff? So I’ll be reading the directions very carefully and as much as possible mixing precise weights and volumes together.

I’ve already figured out how to cut all the remaining necessary pieces out of my three and a half remaining sheets of drywall and my nine remaining sheets of cement board, and then I’m going to have to figure out exactly where my tiles will have to sit vertically to

  1. make an entirely seamless pattern extending from wainscoting to shower surround,
  2. end up with my top row of 2×6 black bullnose tiles overlapping the cement board/drywall joints in both areas, and
  3. not end up with slivers of tile either at the floor or at the tub/wall joint.

I was going to take precise measurements and create a scale drawing in Adobe Illustrator, but it occurs to me that just attaching a bunch of tiles together with masking tape and holding them against the wall will probably be easiest.

We just found the camera cable today, so I finally got all the progress pictures loaded onto the laptop. I’ll see about posting those tomorrow while Jen is off getting her hair done and leaving me with the baby (can’t drywall with a baby, y’know, so I might as well blog).

Tags: , , , , ,

Bathroom Demo Part 2

Well, I didn’t get nearly as much done today as I thought I would, even though we were on the job longer than yesterday.

First thing we did when we got there today was move all the rolled-up demoed carpet from the basement to the garden shed, which took an absurdly long time. Then I got back to work on the remaining drywall in the bathroom.

Just like yesterday, it resisted. A lot. Mostly because it was laid directly over wood (so I couldn’t punch through it and had to scrape at it from the edges instead) and was fastened not with brittle drywall screws but with big honking two-inch eight-penny roofing nails, placed randomly in ones and twos across the sheet.

There’s still sheets of maybe 3/8″ plywood against the studs in the non-plumbed walls of the tub, so I don’t know what’s back there yet, but so far the only visible rot is in the bottom of the side sheet of plywood and a 2×4 blocking in the plumbing wall just at the level of the tub/surround seam.

I did manage to find where the knob & tube wiring interfaces with the romex that goes into the new-work switch and socket. All the lights in the entire house (plus the refrigerator) are wired into one double circuit breaker, and there’s a carrier line for that circuit that goes above the bathroom ceiling, so I hope I can cut and cap the wires coming down into the bathroom without killing any other lights (for now).

WTF part #2: the duct tape “repairs” on the shower surround weren’t actually repairs. Apparently they bought a shower surround built for a modern hotel-style valve and faucet/shower placement, and then just duct-taped over the misplaced holes and drilled their own.

IMG_0245

Here’s some more shots of the bathroom gutted down to the studs.

IMG_0839IMG_0830IMG_0834

I was going to try to save the 3″ tongue-and-groove boards inside the closet, but when I tried removing the first one carefully, it broke right away, so I said the hell with it and just pulled them down with my gloved hands:

IMG_0832IMG_0833

Meanwhile, Jen was shoveling up more rotted pears from the yard and dousing the basement in Simple Green.

Jen wants me to post this part:

Why Jen Hates The Previous Owners:

Not only did they let their cats pee all over the carpets downstairs, but they left bags and bags full of junk in the basement. Not only did they leave their crappy little 2×4-and-plywood desk screwed to the wall in the bedroom, but they left hundreds and hundreds of pounds of trash in the garage and shed — and we’re talking a busted fridge, a busted stove, broken snowboards, a computer monitor, old magazines, a safe that looks like it’s been blown up, and lots lots more.

Worst is the southeast corner, where apparently the previous previous owner put in a retaining wall with the plan of having a waterfall and a little pond. The previous owners allowed that entire area to be overrun with morning glory (I saw the 2007 high-res satellite photo on the monitor at the permit office, and large parts of that area weren’t green), and at this point Jen literally cannot tell where the ground is, there’s so much rotted wood, asphalt shingles, old dishwashers, pond liners, broken bricks, broom handles, wheelbarrows, etc., etc., strewn everywhere and now all grown through with bindweed.

Not only does this represent hundreds more dollars just in dump fees, but it’s also going to take months and months if not years just to clear it. All the while it’ll be a hazard to everybody, not least our daughter who will certainly be bipedal and running around by next spring.

WTF #3: Jen found it almost impossible to scrape up the adhesive underlayment left over from the vinyl flooring in the downstairs basement. She called me down to look at it, and I discovered that in most of the bathroom area the cement underneath the mastic was rough and pebbly. This means to me that when the POs jackhammered up the old slab and installed the bathroom fixtures, they didn’t bother floating the new cement afterwards to smooth it out but just called it a day and slapped the vinyl over it.

IMG_0246

She then demolished most of the stud wall between the walk in closet and the platform the spa tub was going to go on, all of which is in the way of the planned basement bedroom.

IMG_0835IMG_0836IMG_0837

I spent about an hour up in the attic trying to shovel the rockwool insulation away from the basement ceiling, but they don’t call it rockwool for nothing. That crap is dense, and it sticks together in clumps. At that point we got called away because our friend finally called us back about a 10% off coupon from Home Depot she had for us, and we dropped everything and headed out. That was about 4pm. Unfortunately, we had a lot of big heavy stuff to buy at HD, and not much time before we were supposed to pick up our daughter Thekla from her nanny/daycare at 6pm (we were an hour late), so we were rushing around and I’m sure forgot a bunch of stuff that we needed but wasn’t specced out on the materials list.

We rented one of HD’s trucks (since 4×8 greenboard ain’t fitting in the trunk of my Saturn) and drove it the couple miles to the house, where our friend Chris was kind enough to meet us to help unload. (I’ve never driven anything before that beeped when I backed up. 🙂 ) After getting the truck back we discovered that we had forgotten to load the toilet, but Jen threw herself on the mercy of the delivery coordinator and got them to deliver it for us tomorrow for free.

Plan for tomorrow:

  1. Make nice with the building inspector when he shows up and get him to sign off on the reframing plans.* The only conceivably controversial part will be the new basement stairs going through the old entry hall area, since there might need to be a widening of the foundation wall opening.
  2. Drop the bathroom ceiling and just clean up the fracking rockwool when it falls down (I’ll just put R30 fiberglass batts up when I’m done).
  3. Pull up the vinyl flooring in the bathroom and see what condition the subfloor is in.
  4. Demo the stub wall at the end of the tub.

Really, that should about do it. If I get to capping the wiring and plumbing I’ll feel really happy.

And now I’m going to bed. By the way, Flexeril is a wonderful wonderful thing.

 

* This is the preliminary inspection. Seattle has a class of permit called “Subject To Field Inspection”, meaning the job isn’t complicated enough to require full engineering drawings and formal review; instead the inspector just eyeballs the plans and the building before the work starts and approves or not, and then comes out when you’re done and checks that you did it right.

Tags: , , , , , ,

Bathroom Demo Part I

Edited to add: The original graphic theme for this blog wasn’t working out, so we’re trying “Arclite”. Please let us know if there’s any issues with the UI. Thanks!

Yesterday after getting the permits all straightened out I got to spend about three hours working in the bathroom. Today it was about the same — got there about 3:00 and left at 6:00.

The permits and plans “prominently posted at the job site”:

IMG_0678

The bathroom before yesterday and today’s demo. I’d already removed the chair rail molding, the sink and the toilet:

IMG_0664IMG_0665

I pulled off all the remaining moldings and door casings (carefully for the main door, since I’m putting them back). I got all the drywall off of one and a half walls, and all the towel hooks, mirror, etc., which are in pretty good shape and will be appearing in a Craigslist ad very soon.

Bathroom at end of day today:

IMG_0667IMG_0668IMG_0670

So I now think that, in the 1930 floor plan, what is now the parlor was the main bedroom. Either in the original plan or very soon thereafter, they framed in a closet against the wall opposite the bathroom with 2x2s, which is why the bathroom side of that wall is narrow horizontal T&G instead of the wide vertical T&G on the room side that’s used everywhere else.

Much later, very possibly in 1994, the owner knocked out the part of the bathroom/closet wall and drywalled the bathroom.

You can see the framing of the wall between the old closet and the old bathroom in these two photos:

IMG_0671IMG_0672

You can see the end stud and the top plate of the 2×4 wall that was removed, along with nail and pipe/wire holes.

I say in 1994 because I found a bible hidden in the walls with a note inside reading “Hid 12-17-1994”.

IMG_0689IMG_0686

The T&G cladding in the old bathroom was removed (assuming it was ever there), so in there the drywall was 1/2″ and fastened to the studs. In the old closet, the T&G was not removed so they put 1/4″ drywall directly over it. This still didn’t make the walls even, so they had to add wider moldings to the bathroom side.

It wasn’t a load-bearing wall, so I don’t understand why they cut the bottom plate and removed the intermediate studs, but didn’t cut the top plate or remove the end stud. It would have been so much easier to make it look good.

WTF #1: Notice how the cold stubout comes up from the floor but the hot stubout comes down from somewhere:

IMG_0691

Here’s the plan for the next couple of days:

  1. go up in the attic and scoop away all the rockwool insulation from above the bathroom ceiling so I can demo without having all that fall down on me
  2. find the shutoff valve for the tub/shower and then remove the faucets and handles
  3. remove the window casing, the rest of the drywall, the T&G cladding, the vinyl floor, and the plastic shower surround
  4. turn off the power and trace and cap the wiring (removing the hidden junctions or unboxed splices that I’m sure are up in the attic)
  5. drop at least part of the downstairs bathroom ceiling and disconnect the bathub drain
  6. trace the water lines back as far as I can to the earliest common point where I can cap them
  7. hope like hell the subfloor is okay and doesn’t need replacing

The building inspector is scheduled to come by sometime on Monday to review and approve the plans, and I want the bathroom completely opened up by then so he can see the stub wall I want to move isn’t load-bearing. Hopefully he won’t make me reframe the 2×2 old closet wall.