Posts Tagged electrical

Still Here

Right. The earth did not open up and swallow us whole along with our house.

The back bedroom project is still underway, though. After gutting it back in March and April, we pretty much ran out of time and money. In May I was able to get all the framing done: I filled in the existing exterior door, framed two windows, added a real closet, and created a rough door opening where the end of the hallway once was. In June or thereabouts I was able to buy a roll of wire and run the almost all the electrical. And there I stopped for a couple of months.

Luckily, Jen had some stock options from her job that became sellable in August, so we finally had the money to get all the remaining stuff. Last week I took advantage of some time off work and finished the rough electrical and had it inspected (passed except for one minor issue with the closet light fixture placement). I also installed the folding attic stairs (I was able to do it entirely myself with the assistance of our drywall lift — thanks Jen!)

This morning, I went to Home Depot and ordered all the plywood, drywall, joint compound, doors, tar paper, light fixtures, switches, receptacles, etc. that I’ll need to complete (almost) everything. It gets delivered on Tuesday, so I get to spend this weekend doing everything that I can get done short of having the materials on hand: clean up the room, fill in all the floor/ceiling holes with firestop foam, pull the vinyl siding off the relevant sections of wall, flash the rough window openings, etc.

No pictures for this post, but I’ll take plenty as I work on everything next week.

Share

Tags: , , , , , ,

Bedroom Remodel Weekend 1

Last weekend I started on the back bedroom/hallway project. The plan is:

  • Gut down to the studs
  • Frame in the door to the outside
  • Add a window to that wall
  • Take out the existing closet wall and move the doorway back to the bathroom wall
  • Add a real closet and a reading nook
  • Rewire properly
  • Add attic stairs to the hallway ceiling
  • Lay down a plywood floor in the attic for storage
  • New drywall and moldings

Before

Saturday we had a lot of social appointments, so I only had time to pull down all the trim and moldings.

Casings down

Window casings too

Sunday I got out the big prybar and framing hammer and took down all the tongue and groove boards on the walls. I’ve pulled all the nails out and I’m hoping to be able to get something for them on Craigslist.

The hallway

The closet

Outside walls

Kitchen wall

Interestingly, the shared wall to the kitchen shows two framed-in doorways, one narrow and one normal size. I suspect that originally the hallway ended in a linen closet and the access to the back bedroom was through the kitchen approximately where the wall ovens are now. Supporting this theory is the fact that the vertical framing around the current bedroom doorway is kinda rough-sawn and that the stud on the kitchen wall opposite the end of the bathroom wall has lots of nail holes in it.

Oh, and also, apparently nobody who ever worked on this house ever heard of a header over windows and doors. The existing doorway is non-load bearing and so doesn’t need one, but the existing window, outside door, and framed-in doors on the kitchen wall are all on exterior or load-bearing walls. None of them have any more than the top plate 2×4. It’s a wonder this house isn’t sagging more than it already is.

Sometime this week I’ll take an hour and pull down and bag up all the blown-in insulation in the walls. Then next Saturday I knock down the closet wall and pull down the ceilings. That means a huge pile of rockwool insulation on the floor so that might be all I can get done in a day.

Pulling nails amid the pile of junk lumber

I also need to get my permit renewed so I can be all proper and legal.

Share

Tags: , , , , ,

Catching Up With Casa de Lovely

Since my last post I’ve gotten a bunch of smallish projects done, and I’ll address those before going into the stairs project and the painting project:

Plumbing

I spent a Saturday wrestling monkey wrenches over my head and broke back the galvanized water pipes to the most convenient joints, and substituted in PEX. I got everything installed, turned the water back on, checked all my joints, and found no leaks at all. Yay!

Then I noticed a drip. Grrr.

Turns out that I had a pinhole leak in a section of the galvanized that I hadn’t even touched. So I got to turn the water off again, heft the monkey wrenches again, and break out another section of galvanized. Luckily, that was the last of the work for the day. There’s still more galvanized, but it can wait until I can buy a manifold and replace it all.

I also ended up having to replace the kitchen sink supply valves (and then the flexible supply lines as well since they were clogged with galvanized pipe-rust), and the PEX-compatible ball valves were so easy to work with I don’t see any particular reason to mess around with copper stubouts and compression valves at all — just run the PEX out of the wall in a chrome sleeve and crimp a valve onto it and you’re all done.

Electrical

Of course, all the plumbing work was in support of putting in a new electrical panel. The guys from Kemly Electric came out and did a great job installing it and putting in the new mast, and then a couple days later the city moved the wires and put in the meter, and Kemly came back and set up the feeder line to the old panel.

I’ve moved the bathroom circuits and the cooktop circuit to the new panel. I suppose I could move the dryer circuit but I haven’t gotten around to it yet. The rest will have to wait until I start renovating rooms.

More Plumbing

Shortly after installing the supply lines, I went to run a load of laundry. I came back later to find the utility sink completely full of water. Apparently the drain had chosen that moment to clog. Since it’s the drain that serves the washing machine, the kitchen sink, and the dishwasher, I needed to fix it immediately.

So I basically rebuilt the entire trap, with long-throw bends and a cleanout, so it won’t clog as much and if it does I can unclog it without having to cut it all out again.

Before

After

Through all the frustration and work, I kept telling myself I was not going to call a plumber, dammit.

That completed, I decided the next day to finally install the new garbage disposal that’s been sitting in a box under the sink for almost a year. Installing it was pretty easy, except when I realized that it was physically larger than the old disposal and therefore the shunt over to the sink trap was at the wrong height.

So I basically had to completely rebuild that trap as well. Sigh. At least it’s now built so that it won’t accumulate ick in the shunt pipe, and I installed an air access valve so at least the kitchen sink now has a vent.

Kitchen disposal and trap rebuild

The neat thing about the garbage disposal is that it’s very very powerful. The damn thing sounds like a tractor engine starting up or something.

I think that’s it. Now on to the stairs…

Share

Tags: , , , , ,

Electrical Upgrade Preparations

We’re finally able to go ahead with upgrading the electrical service from 125 amp (and a totally-full, out-of-date, not-terribly-safe panel) to a nice shiny new 200 amp Siemens panel.

The plan is to install a new mast and meter in a better location on the house (where the wires won’t cross over the roof at no more than five feet clearance), run conduit back to the same room in the basement as the old panel, install the new panel there, put in a 100-amp breaker and run a feeder cable to the old panel. That way I can leave the horrible mess of electrical spaghetti untouched for now, and as I remodel rooms put new circuits in the new panel and retire circuits from the old panel until I can remove the old panel completely.

Also, the old panel is attached to a stud wall that I’m going to want to remove (well, it’s attached to the beam above a stud wall, but I wouldn’t want to remove the wall and leave the panel just hanging out in open space). The new location will let me reconfigure the walls however I like, and still leave plenty of room on that wall for washer/dryer/utility sink.

Before the electrician can come out, however, I’ve got a lot of work to do to prep the site. There’s a set of stairs from one of our back doors that needs to get detached and pulled away from the house so the conduit can run (I’ll cut a hole and put them back later). There’s a bunch of drywall that needs to get removed to clear a path for the grounding wire to reach the plumbing (at least the plumbing that will be left once I convert everything to PEX). And, most importantly, there’s a couple of water pipes directly over where the panel will go, which is forbidden by code (confirmed with an electrical inspector at the permit department).

So the plan is to cut out those pipes and divert them around the panel location using push-on or compression connectors and 3/4″ PEX. The problem is that they’re embedded in/hidden behind a plaster ceiling one of the previous owners installed in the whole central section of the basement (for fire protection from the furnace maybe? who knows).

Actually, I’m beginning to think that’s not plaster, it’s concrete. This hole took me half an hour beating on it with a crowbar and hammer:

Here’s a closeup, after some of the wire mesh lath has been cut away:

The reason I’m thinking it’s concrete is not only is it really hard but the sawzall will barely notch it (although it’s easy to cut out the mesh and keys once I’ve knocked off the visible layer).

So here’s the plan, before and after:

Hopefully I can at the very least get all the demo done on Saturday, and then I’ll be taking two days off work: the day the electrician comes to let him in and supervise and do any last-minute helpful homeowner things, and the day before to complete the plumbing and remaining demo.

Then the city’s inspection, then the Seattle City Light guy comes out for his inspection, then he schedules a crew for the re-splice to the service wire, and on that day the electrician comes back and makes the final hookup from the new box to the old, and then we have a completed upgrade.

Yay!

Share

Tags: , , , , , ,

Some Progress Lately

The treehouse is down. Went up on the ladder with the sawzall a couple of weekends ago and made pretty short work of it, considering that it was fairly sturdily built — except of course it was built of non-treated lumber so the roof was bowed in and the 2x4s were soaking wet. It’s really amazing how big the pile of junk lumber is from such a small building.

No more treehouse!

The absurdly large debris pile

The bathroom shelves are up, or at least two of them are since for some reason the middle shelf didn’t fit. I’m not terribly happy with how they came out, but at least there are shelves there and we can start using them for storage. When I have a few bucks lying around I’ll go get a sheet of birch plywood and do them better. I figure if I construct the shelf and the braces in one unit and attach it to the wall all together there will be fewer gaps.

The bathroom touchup painting isn’t done, but all the holes are filled and sanded. I now know that putty has to be applied pretty thickly because it shrinks as it cures. Hopefully I can finish that next weekend, and paint the door and window jambs where the old pink paint is showing through.

Last, I demoed out the wall in front of the old basement access door, and removed the plywood covering the stairs that gave us so much trouble with the underwriters last fall. Apparently, Nate is a big do-do head crap’r, whatever that means. Once I get the door freed of its very thick layer of silicone/rubber/whatever-the-hell-it-is caulk and get a padlock installed, I can move forward with taking out the existing stairs and filling in the living room floor with a temporary plywood patch.

Oh, those wacky previous owners!

I also have a good quote from an electrician to upgrade the service to 200 amps. Now I need to figure out what the schedule is for inspections and for Seattle City Light to hook up the new mast, and then I can schedule the electrician. I’m moving the location of the panel to the foundation wall, so I can remove the plastered-over stud wall the current panel is attached to when I completely gut the basement.

Share

Tags: , , , , , , ,